We work year round, under challenging conditions. Below are just a few representative projects from our 30 year track record.

 
 
IMG_7814.jpg

Ice Bridge Installation for Fort Nelson River Bridge Upgrade

Built ice bridge over Fort Nelson River to provide access to bridge piers for a geotechnical investigation for bridge top upgrade.

IMG_1317.jpg

Access for Orphan Well
Abandonment Program

Built 25 kilometers of winter access roads for an orphan well and pipeline deactivation and abandonment project at Milo Lake. The project was completed on time and under budget.

IMG_1339.jpg

Multi Well Pad and Gathering
System Installation

 16” Gas Gathering and 16” waterline, internally coated with CCB rings for Encana at Horn River Basin Development. Installation project ran concurrently with well testing and completion.

IMG_6328.jpg

Pipeline Construction
Project

This was a 6" pipeline construction project completed for Endurance Energy. The project entailed 4 well pad construction and tie in.    

IMG_9049.jpg

Smart Pigging
Operations

Launched 12” tethered Smart Pig for Centrica. Completed integrity digs and repaired defects in pipeline.

IMG_4442.jpg

Petitot Compressor
Station Deactivation

Disassembly, removal and transportation of Petitot Gas Compressor for facility that was being decommissioned.

DJI_0210_Moment+saguaro+concurrent+operations.jpg

Multi Well Tie-In
Concurrent Operations

Performed for Saguaro Resources: concurrent operations with well testing and coil tubing operations on an operating location. Completed dual well tie in.

IMG_0198.jpg

Geotechnical Survey
Fort Nelson River

Evaluation of a permanent water intake to Kiwigana field for Encana Corp. The complex project entailed flying the barge and drill into place using a helicopter, and positioning the barge using a river boat.

IMG_3163.jpg

Pipeline Construction
Project

This was a 12" pipeline construction project completed for Endurance Energy. The project involved connecting 4 well pad, Bigfoot, NEBC.

IMG_5302.jpg

Installation of CORE Linepipe and ClickWeld Technology

Completed installation of 8" CORE Linepipe HDPE Liner and ClickWeld technology for Saguaro Resources. The installation was completed within existing row, thus reducing environmental impact.

IMG_6003.jpg

Installation of Stillwell for Fresh Water Intake

Installed stillwell for fresh water intake from the Fort Nelson River. The project was completed for Encana Corporation under challenging winter conditions: extreme cold required tarping concrete base with heaters.

DJI_0114.jpg

Pipeline Installation with Multiple Third Party Crossings

Installed 168.3 pipeline, with multiple 3rd party pipeline crossings, and zero incidents. Completed for Canlin Energy, this project required compressor restaging and piping modifications.

IMG_6541.jpg

Winter Access Roads

Built winter access into Yo-yo orphan wells.

DJI_0407_Moment1.jpg

Beaver River Barging

Barging equipment on the Liard River after completing road repairs in preparation for Beaver river orphan well abandonments.