We work year round, under challenging conditions. Below are just a few representative projects from our 30 year track record.
Ice Bridge Installation for Fort Nelson River Bridge Upgrade
Built ice bridge over Fort Nelson River to provide access to bridge piers for a geotechnical investigation for bridge top upgrade.
Access for Orphan Well
Abandonment Program
Built 25 kilometers of winter access roads for an orphan well and pipeline deactivation and abandonment project at Milo Lake. The project was completed on time and under budget.
Multi Well Pad and Gathering
System Installation
16” Gas Gathering and 16” waterline, internally coated with CCB rings for Encana at Horn River Basin Development. Installation project ran concurrently with well testing and completion.
Pipeline Construction
Project
This was a 6" pipeline construction project completed for Endurance Energy. The project entailed 4 well pad construction and tie in.
Smart Pigging
Operations
Launched 12” tethered Smart Pig for Centrica. Completed integrity digs and repaired defects in pipeline.
Petitot Compressor
Station Deactivation
Disassembly, removal and transportation of Petitot Gas Compressor for facility that was being decommissioned.
Multi Well Tie-In
Concurrent Operations
Performed for Saguaro Resources: concurrent operations with well testing and coil tubing operations on an operating location. Completed dual well tie in.
Geotechnical Survey
Fort Nelson River
Evaluation of a permanent water intake to Kiwigana field for Encana Corp. The complex project entailed flying the barge and drill into place using a helicopter, and positioning the barge using a river boat.
Pipeline Construction
Project
This was a 12" pipeline construction project completed for Endurance Energy. The project involved connecting 4 well pad, Bigfoot, NEBC.
Installation of CORE Linepipe and ClickWeld Technology
Completed installation of 8" CORE Linepipe HDPE Liner and ClickWeld technology for Saguaro Resources. The installation was completed within existing row, thus reducing environmental impact.
Installation of Stillwell for Fresh Water Intake
Installed stillwell for fresh water intake from the Fort Nelson River. The project was completed for Encana Corporation under challenging winter conditions: extreme cold required tarping concrete base with heaters.
Pipeline Installation with Multiple Third Party Crossings
Installed 168.3 pipeline, with multiple 3rd party pipeline crossings, and zero incidents. Completed for Canlin Energy, this project required compressor restaging and piping modifications.
Winter Access Roads
Built winter access into Yo-yo orphan wells.
Beaver River Barging
Barging equipment on the Liard River after completing road repairs in preparation for Beaver river orphan well abandonments.